What needs to be done before preparing to build the cold room?
Usually, many people are blind before building cold storage, just want to build cold storage. Not planned. The construction of cold storage can be divided into two parts: the construction of the warehouse itself and the configuration of logistics equipment and systems in the warehouse, and the standards to be followed are different. There are a series of standards and specifications for the construction of cold storage, and there are detailed regulations on refrigeration methods, roofs, walls, floors, foundations, fire protection, and electrical. From the perspective of system integration, cold storage planning and construction should first grasp these three keys:
1. Unitized logistics is the content that should be paid the most attention
2. It is critical to select materials suitable for low-temperature environments
3. Strictly meet the building fire code
#cold room
#cold storage
www.freezercold.com