Your location:Home   News   Company news
What needs to be done before preparing to build the cold room?
 Mar 30, 2022|View:236

Usually, many people are blind before building cold storage, just want to build cold storage. Not planned. The construction of cold storage can be divided into two parts: the construction of the warehouse itself and the configuration of logistics equipment and systems in the warehouse, and the standards to be followed are different. There are a series of standards and specifications for the construction of cold storage, and there are detailed regulations on refrigeration methods, roofs, walls, floors, foundations, fire protection, and electrical. From the perspective of system integration, cold storage planning and construction should first grasp these three keys:
1. Unitized logistics is the content that should be paid the most attention
2. It is critical to select materials suitable for low-temperature environments
3. Strictly meet the building fire code
#cold room
#cold storage
www.freezercold.com

First Page(1).jpg

Contact Us
Tel: 0086-15961168909
Email: aaron@freezercold.com
Add: LuoYangtown, Changzhou, Jiangsu Province 
CHINA 213176
Get The Design Plan And Quotation
We provide professional customized services according to project requirements, please provide the information about your project, and we will provide you with a list immediately.
Company Name
*
This field is required
Email
*
This field is required
Email format error
Phone
This field is required
Telephone information is wrong!
Cold Room Size
Temperature
What will store in
Voltage/Frequency
Do you have the drawing
Message
*
This field is required
Send Message